Question: A lean work center is being operated with a container size of 25 units and a demand rate of 100 units per hour. Assume it
- A lean work center is being operated with a container size of 25 units and a demand rate of 100 units per hour. Assume it takes 120 minutes for a container to circulate. (1 point)
(Note: 120 minutes = 2 hours)
- How many containers are required to operate this system?
- What is the maximum inventory that can accumulate?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
