Question: Suppose a lean work center is being operated with a container size of 25 units and a demand rate of 100 units per hour. Also
Suppose a lean work center is being operated with a container size of 25 units and a demand rate of 100 units per hour. Also assume it takes 180 minutes for a container to circulate.
a. How many containers are required to operate this system?
b. What is the maximum inventory that can accumulate?
c. How many kanban cards are needed?
Step by Step Solution
3.31 Rating (178 Votes )
There are 3 Steps involved in it
a By using the formula n DTC the number of containers required is 3 10... View full answer