Question: A linear programming computer package is needed. Frandec Company manufactures, assembles, and rebuilds material-handling equipment used in warehouses and distribution centers. One product, called a
A linear programming computer package is needed.
Frandec Company manufactures, assembles, and rebuilds material-handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 4,500 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit are shown.
| Component | Manufacturing Cost | Purchase Cost |
|---|---|---|
| Frame | $39.00 | $52.00 |
| Support | $12.50 | $16.00 |
| Strap | $7.50 | $8.50 |
Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows.
| Component | Department | ||
|---|---|---|---|
| Cutting | Milling | Shaping | |
| Frame | 3.5 | 2.2 | 3.1 |
| Support | 1.3 | 1.7 | 2.6 |
| Strap | 0.8 | 1.7 | |
| Capacity (hours) | 350 | 420 | 680 |
(a)
Formulate and solve a linear programming model for this make-or-buy application. (Let FM = number of frames manufactured, FP = number of frames purchased, SM = number of supports manufactured, SP = number of supports purchased, TM = number of straps manufactured, and TP = number of straps purchased. Express time in minutes per unit.)
Min
38FM+51FP+11.5SM+15SP+6.5TM+7.5TP
Cutting constraint
3.5FM+1.3SM+0.8TM21000
Milling constraint
2.2FM+1.7SM25200
Shaping constraint
3.1FM+2.6SM+1.7TM40800
Frame constraint
FM+FP5000
Support constraint
Strap constraint
FM, FP, SM, SP, TM, TP 0
How many of each component should be manufactured and how many should be purchased? (Round your answers to the nearest whole number.)
(FM, FP, SM, SP, TM, TP) =
(b)
What is the total cost (in $) of the manufacturing and purchasing plan?
$
(c)
How many hours of production time are used in each department? (Round your answers to two decimal places.)
Cutting hrs Milling hrs Shaping hrs
Step by Step Solution
There are 3 Steps involved in it
The question material youve provided appears to be incomplete as it is missing som... View full answer