Question: A linear programming computer package is needed. Frandec Company manufactures, assembles, and rebuilds material-handling equipment used in warehouses and distribution centers. One product, called a
A linear programming computer package is needed.
Frandec Company manufactures, assembles, and rebuilds material-handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 5,500Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit are shown.
| Component | Manufacturing Cost | Purchase Cost |
|---|---|---|
| Frame | $37.00 | $50.00 |
| Support | $10.50 | $14.00 |
| Strap | $5.50 | $6.50 |
Three departments are involved in the production of these components. The time (in minutes per unit) required to process each component in each department and the available capacity (in hours) for the three departments are as follows.
| Component | Department | ||
|---|---|---|---|
| Cutting | Milling | Shaping | |
| Frame | 3.5 | 2.2 | 3.1 |
| Support | 1.3 | 1.7 | 2.6 |
| Strap | 0.8 | 1.7 | |
| Capacity (hours) | 350 | 420 | 680 |
(a)
Formulate and solve a linear programming model for this make-or-buy application. (Let FM = number of frames manufactured, FP = number of frames purchased, SM = number of supports manufactured, SP = number of supports purchased, TM = number of straps manufactured, and TP = number of straps purchased. Express time in minutes per unit.)
Min
37FM+10.5SM+5.5TM+50FP+14SP+6.5TP
Cutting constraint Milling constraint Shaping constraint Frame constraint Support constraint Strap constraint
3.5FM+1.3SM+0.8TM350
2.2FM+1.7SM420
3.1FM+2.6SM+1.7TM680
FM+FP5500
SM+SP5500
TM+TP5500
FM, FP, SM, SP, TM, TP 0
How many of each component should be manufactured and how many should be purchased? (Round your answers to the nearest whole number.)
(FM, FP, SM, SP, TM, TP) =
(b)
What is the total cost (in $) of the manufacturing and purchasing plan?
$
(c)
How many hours of production time are used in each department? (Round your answers to two decimal places.)
Cutting hrs Milling hrsShaping hrs
(d)
How much (in $) should Frandec be willing to pay for an additional hour of time in the shaping department?
$
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock