Question: A loader operating at a 1 2 0 c y h r has a 2 - cy heaped capacity bucket and has a 1 .
A loader operating at a has a cy heaped capacity bucket and has a min load cycle. The trucks have cy capacity and a min dump, haul, and return cycle time. The loader has a fill factor. The project works at a min hours efficiency. What is the truck production and how many trucks are needed to balance the loader production? points