Question: 10.10 An earthmoving project has available one loader with a 6-cy heaped capacity bucket and a larger loader with a 7-ey heaped capacity bucket for

10.10 An earthmoving project has available one
10.10 An earthmoving project has available one
10.10 An earthmoving project has available one loader with a 6-cy heaped capacity bucket and a larger loader with a 7-ey heaped capacity bucket for filling 45.9-cy heaped capacity off-road trucks. All equipment operates at 50-min hours. Loaders produce a bucket fill factor of 90%, and truck fill factor is 100%. Loaders do not short load." Loader cycle time is 0.6 min for both loaders (no travel). Truck dump time is 05 min (includes maneuvering, dumping, and turning). The loaded tracks climb uphill through the following three sections and return empty downhill through the same sections. Trucks operate at rated loaded and empty weights. Speed loaded (mph) Section Speed empty (mph) 42 42 42 Length (ft) 2,000 500 1,000 1 2 3 10 7 8 NO Calculate the number of cycles per loader to fill each truck. Calculate the number of trucks required for each loader. Based on the number of trucks you determine, develop a curve for the $/cy production cost vs. trucks curve for a range of +2 trucks. Use the following hourly rates (including operator) for each piece of equipment: 6-cy capacity loader $120/hr 7-cy capacity loader $125/hr 45.9-cy off-road truck $130/hr 100 TY 10.10 An earthmoving project has available one loader with a 6-cy heaped capacity bucket and a larger loader with a 7-ey heaped capacity bucket for filling 45.9-cy heaped capacity off-road trucks. All equipment operates at 50-min hours. Loaders produce a bucket fill factor of 90%, and truck fill factor is 100%. Loaders do not short load." Loader cycle time is 0.6 min for both loaders (no travel). Truck dump time is 05 min (includes maneuvering, dumping, and turning). The loaded tracks climb uphill through the following three sections and return empty downhill through the same sections. Trucks operate at rated loaded and empty weights. Speed loaded (mph) Section Speed empty (mph) 42 42 42 Length (ft) 2,000 500 1,000 1 2 3 10 7 8 NO Calculate the number of cycles per loader to fill each truck. Calculate the number of trucks required for each loader. Based on the number of trucks you determine, develop a curve for the $/cy production cost vs. trucks curve for a range of +2 trucks. Use the following hourly rates (including operator) for each piece of equipment: 6-cy capacity loader $120/hr 7-cy capacity loader $125/hr 45.9-cy off-road truck $130/hr 100 TY

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!