Question: A longitudinal leveling ( One point per section ) was performed along road centerline as follows: table [ [ Station ( m ) ,

A longitudinal leveling (One point per section) was performed along road centerline as follows:
\table[[Station (m),0.00,25.00,50.00,75.00,100.00,125.00,160.00],[Exist Ground Elev. (m),54.20,54.20,52.90,52.60,51.30,51.00,50.7]]
Given that the elevation of the road at the start station is 56.00m and it slopes 1.0% downwards. The road width is 14m with side is 3:2(H:V). It is required to:
1- Calculate the cross-sectional areas at ALL stations,
2- Calculate the volume of earthworks, using Simpson's rule, wherever applicable.
3- Calculate the volume of earthworks, using trapezoidal rule.
A longitudinal leveling ( One point per section )

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!