Question: A machine makes two components; call them types A and B. It takes 650 seconds to switch production between the component types. During that time,

A machine makes two components; call them types A
A machine makes two components; call them types A and B. It takes 650 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0,5 second to be completed. The two components, A and B are combined in an assembly process to make a final product, call it C. The assembly step can combine the two components into 1 unit every 2 seconds, or 30 units per minute. Assume there is ample demand. Suppose the machine rotates between one batch of 2600 units of A and 2600 a. units of B. In that case, what is the capacity of the machine in component pairs per minuto, where a component pair is one unit of A and one unit of B? component pairs per minute b. percent Suppose the machine rotates between one batch of 2600 units of A and 2600 units of B. What is the utilization of the machine? Suppose the machine rotates between one batch of 2600 units of A and 2600 units of B. What is the average inventory of B components? units d. units If the production schedulo could be adjusted with the goal of minimizing Inventory in the process without constraining the flow rate, how many units of A should be produced before switching to component B? Assume the same number of units of B would be produced as well. Do not found intermediato calculations. Final answers should be in whalu numbers

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!