Question: A machine makes two components; call them types A and B. It takes 550 seconds to switch production between the component types. During that time,
A machine makes two components; call them types A and B. It takes 550 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 4 seconds, or 15 units per minute.
a. Suppose the machine rotates between one batch of 2,200 units of A and 2,200 units of B. In that case, what is the capacity of the machine in component pairs per minute, where a component pair is one unit of A and one unit of B?
I already know the answer is 40 for this part
b. Suppose the machine rotates between one batch of 2,200 units of A and 2,200 units of B. In that case, what is the capacity of the machine in component pairs per minute, where a component pair is one unit of A and one unit of B?
I already know the answer is 25 for this part
c. Suppose the machine rotates between one batch of 2,200 units of A and 2,200 units of B. In that case, what is the capacity of the machine in component pairs per minute, where a component pair is one unit of A and one unit of B?
I already know the answer to this part is 963
d. Suppose the machine rotates between one batch of 2,200 units of A and 2,200 units of B. In that case, what is the capacity of the machine in component pairs per minute, where a component pair is one unit of A and one unit of B?
I need help solving this part of the question. The previous questions that were similar or the same as this one. They all have an incorrect answers for part d.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts