Question: A manager wants to build 3 - X - bar control limits for a process: the values for the mean of the process is 1

A manager wants to build 3- X-bar control limits for a process: the values for the mean of the process is 10 units and the average range of the process is 6. It samples of 9 are to be taken what will teh upper (UCL) or lower (LCL) control limits