Question: A manager wants to build 3 - X - bar control limits for a process: the values for the mean of the process is 1
A manager wants to build Xbar control limits for a process: the values for the mean of the process is units and the average range of the process is It samples of are to be taken what will teh upper UCL or lower LCL control limits