Question: A manager wants to build a 3 sigma ( i . e . , with confidence level 9 9 . 7 3 % )

A manager wants to build a 3\sigma (i.e., with confidence level 99.73%) mean-chart for a process. Suppose that the centre line (x) for the mean of the process is 10 units, and the standard deviation of the process is 3. If samples of size 9 are to be taken, the Upper Control Limit (UCL) and Lower Control Limit (LCL) will be
Question 14 options:
4 and 16
12 and 8
19 and 1
13 and 7

Step by Step Solution