Question: A manual assembly line is to be designed to make a small consumer product. The work elements, their times, and the precedence constraints are given
A manual assembly line is to be designed to make a small consumer product. The work elements, their times, and the precedence constraints are given in the table below.
tableElementTime Preceded by
The workers will operate the line for min per day, and must produce products per day. A mechanized belt, moving at a speed of will transport the products between stations. Because of the variability in the time required to perform the assembly operations, it has been determined that the tolerance time should be times the cycle time of the line.
a Determine the ideal minimum number of workstations on the line.
bi Use the Largest Candidate Rule method to balance the line.
ii Use the Ranked Positional Weight method to balance the line.
c Calculate the balance delay for your solution in part bi & bii
dDetermine the spacing between assemblies on the line.
e the required length of each workstation to meet the specifications of the line.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
