Question: A manual assembly line is to be designed to make a small consumer product at the rate of 100,000 unit/yr. The line will be operated

A manual assembly line is to be designed to make

A manual assembly line is to be designed to make a small consumer product at the rate of 100,000 unit/yr. The line will be operated 8 hr/shift, two shifts per day, five days/wk, 52 wk/yr. The work elements, their times, and precedence constraints are given in the Table Q5. Previous experience suggests that the uptime efficiency for the line will be 95% and reposition time is 1.0 min. a) Determine the ideal minimum number of workers on the line. b) Use the Kilbridge and Wester method to balance the line. Table Q5 Element Time Te Preceded Element Time Te Preceded by: by: 6 1 | | | | 0.5 0.18 0.65 0.4 0.72 1 7 8 9 10 1.0 0.35 0.75 0.8 0.3 3 4,5 5,6 7,8 9 2 2,3 A manual assembly line is to be designed to make a small consumer product at the rate of 100,000 unit/yr. The line will be operated 8 hr/shift, two shifts per day, five days/wk, 52 wk/yr. The work elements, their times, and precedence constraints are given in the Table Q5. Previous experience suggests that the uptime efficiency for the line will be 95% and reposition time is 1.0 min. a) Determine the ideal minimum number of workers on the line. b) Use the Kilbridge and Wester method to balance the line. Table Q5 Element Time Te Preceded Element Time Te Preceded by: by: 6 1 | | | | 0.5 0.18 0.65 0.4 0.72 1 7 8 9 10 1.0 0.35 0.75 0.8 0.3 3 4,5 5,6 7,8 9 2 2,3

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!