Question: A Methods and Measurements Analyst needs to develop a time standard for a certain task in a preliminary study, he observed one this employees perform

A Methods and Measurements Analyst needs to
A Methods and Measurements Analyst needs to develop a time standard for a certain task in a preliminary study, he observed one this employees perform this task five times with the following results OBSERVATION 4 TIME SECONDS 34 76 B0 7 What is the standard time (ST) for this task if the employee worked at a twenty-five percent fuster pace than the average and allowance of twenty percent of the ways used Select 2.125 seconds 120 100 secondi d. 30 seconds GE