Question: A Moroccan company in the electronics sector operates a network constituted of: (a) 2 assembly plants dedicated to the production of RFID devices, (b) 2

A Moroccan company in the electronics sector operates a network constituted of: (a) 2 assembly plants dedicated to the production of RFID devices, (b) 2 handling facilities that serve as transit sites and where the nal packaging of the devices is done, and (c) 3 stores selling the device to industrial partners. The capacities of the plants, as well as the unit shipping costs (expressed in MAD by device shipped) from the plants to the handling facilities are provided in the table below. Similar to the previous problem, a plant is allowed, if needed, to produce less than its capacity, but cannot exceed the latter. All the demand of the stores needs to be met exactly.

Plant/Handling Facility

Unit Shipping Costs (MAD)

Capacity

HF1

HF2

P1

50.80

21.00

230

P2

19.90

46.50

287

The unit shipping costs (expressed in MAD by device shipped) from the handling facilities to the stores, as well as the stores demands, are given in the table below.

Handling Facility/Store

Unit Shipping Costs (MAD)

S1

S2

S3

HF1

34.40

34.00

34.80

HF2

45.90

33.30

40.80

Demand

63

147

107

  1. Define the decision variables of this transshipment problem (Hint: there are 10 of them).
  2. Express the problems objective
  3. Express the two constraints at the handling facilities.

HF1 constraint:

HF2 constraint:

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock