Question: A part called inner frame is produced in a batch size of 200 units. The batch must be routed through five operations to complete the

A part called inner frame is produced in a batch

A part called inner frame is produced in a batch size of 200 units. The batch must be routed through five operations to complete the processing of the parts. Average setup time is 0.5 hr/operation, and average operation time is 12 min (0.2 hr), Average non-operation time due to handling, delays, inspections, etc. is 0.2 hours for each operation. Determine how many days it will take to complete the batch, assuming the plant runs one 8-hr shift/day. [20 pts]