Question: A pipe is to be installed between points A to D . The ground level has been recorded and the required level for the underside
A pipe is to be installed between points to The ground level has been recorded and the required level for the underside of the pipe at point A has been calculated. The pipe must fall at a stated gradient the ratio of change in vertical height with horizontal distance, : is given in the table below with the pipe reducing in level from A to D A traveller height provided in the table is to be used in conjunction with sight rails to ensure the excavation reaches the correct depth and the pipe is installed at the correct fall. The sight rails must be more than above the ground but less than above the ground surface.
tablePointtableChainage