Question: A plant manager needs a design for an assembly line of a new product that is being introduced. The desired output rate is 3 0
A plant manager needs a design for an assembly line of a new product that is being introduced. The
desired output rate is units per hour. The time requirements and immediate predecessors for the
work elements are as follows:
Using the concept of line balancing, what is the minimum required number of workstations? Show all line
balancing steps precedence diagram and complete line balancing table