Question: A plot below the lower control limit on the range chart ( I ) should be ignored since lower variation is desirable. ( II )
A plot below the lower control limit on the range chart
I should be ignored since lower variation is desirable.
II may be an indication that process variation has decreased.
III should be investigated for assignable cause.
Multiple Choice
I and
I and III
II and III
II only
I, II and III