Question: A process at a watch assembly plant has been changed. The process is divided into three work elements. A time study has been performed with

A process at a watch assembly plant has been changed. The process is divided into three work elements. A time study has been performed with the following results. The manager asked you to calculate a new standard time, based on the following data (see the table). The allowance for the whole process is 18 percent of the total normal time. Rating factor (RF); Obs Observation ObservationObservation Observation Observation RF 1234 Element 13.82.343.122.861 Element 25.24.785.14.71.1 Element 33.181.982.788.90.9 The new standard time is(Choose the closest answer )14.4717.7417.7810.5111.50