Question: 6. A process at a watch assembly plant has been changed. The process is divided into three work elements (see table below). A time study

 6. A process at a watch assembly plant has been changed.

6. A process at a watch assembly plant has been changed. The process is divided into three work elements (see table below). A time study has been performed with the following results. The time standard for the process previously was 14.5 minutes. Based on the new time study, should the time standard be revised (essay \& calculation format)? The new time study had an initial sample of four observations, with the results shown in the following table. The performance rating factor ( R) is shown for each element, and the allowance for the whole process is 18 percent of the total normal time

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!