Question: A process engineer can produce an item using Machine A or B. Machine A has fixed cost of $4000 for tooling and a variable cost

A process engineer can produce an item using

A process engineer can produce an item using Machine A or B. Machine A has fixed cost of $4000 for tooling and a variable cost of $6 per unit. Machine B requires a special machine with a fixed cost of $22,000 and a variable cost of $2 per piece. How many units should be produced to get less cost in Machine B than A