Question: A process engineer has defined the control limits for this process as three standard deviations above and below the mean, meaning that if a lot
A process engineer has defined the control limits for this process as three standard deviations above and below the mean, meaning that if a lot of measurements suddenly appear outside these limits the process is out of control. Ideally, these control limits are within the product specification limits For this product, the specification limits are and If a width does not fall between these values, the chip fails testing and is destroyed. What are the control limits for this process?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
