Question: A process has a lower specification limit and no upper limit. The current process yield has 0.39% of everything below the lower limit. What is

A process has a lower specification limit and no upper limit. The current process yield has 0.39% of everything below the lower limit. What is the capability (Cpk) of this process. 2.66 O 0.89 2.84 1.67