Question: A process is in control with Xbar = 79, star = 2.0. Suppose that the process has the specifications set at 80 8. If a
A process is in control with Xbar = 79, star = 2.0. Suppose that the process has the specifications set at 80 8. If a sample of size n = 6 is used, answer the following questions.
- Estimate the process standard deviation
- Estimate the potential capability of the process.
- Estimate the actual capability of the process.
- If the target is set at 80, what is an estimate for the Cpm index?
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
