Question: A production line has three machines A , B , and C , with reliabilities of 0 . 9 9 , 0 . 9 6
A production line has three machines and with reliabilities of and respectively. The machines are arranged so that if one breaks down, the others must shut down Engineers are weighing two alternative designs for increasing the line's reliability. Plan involve adding an identical backup line ie a series backup and Plan involves providing a backup fo each machine ie a parallel backup In either case, three additional machines A B and C woulc be used with reliabilities equal to the original three.
a Which plan will provide higher reliability?
b Explain why the two reliabilities are not the same.
c What other factors might enter into the decision of which plan to adopt?
d Assume that a single switch is used in Plan to transfer production to the backup line if th first line fails, and this switch is percent reliable, while reliabilities of the machines remair the same. Recalculate the reliability of Plan Compare this reliability with the reliability o Plan calculated in solving the original problem. How much did reliability of Plan decreas as a result of a percent reliable switch?
e Assume that three switches are used in Plan to transfer production to the backup machines i the original machines fail, and these switches are all percent reliable, while reliabilities o the machines remain the same. Recalculate the reliability of Plan Compare the reliability o this plan with the reliability of Plan calculated in solving the original problem. How mucl did reliability of Plan decrease?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
