Question: A production line has three machines A , B , and C , with reliabilities of . 9 9 , . 9 0 , and

A production line has three machines A, B, and C, with reliabilities of .99,.90, and .80, respectively. The machines are arranged so that if one breaks down, the others must shut down. Engineers are weighing two alternative designs for increasing the line's reliability. Plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. In either case, three machines (A,B, and C) would be used with reliabilities equal to the original three.
a. Compute overall system reliability under Plan 1.(Round your intermediate calculations and final answer to 4 decimal places.)
Answer is complete and correct.
b. Compute overall system reliability under Plan 2.(Round your intermediate calculations and final answer to 4 decimal places.)
Answer is complete but not entirely correct.
0.9409
 A production line has three machines A, B, and C, with

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!