Question: A production line is designed for a job with three tasks. The task times are 0 . 3 minutes, 1 . 4 minutes, and 0

A production line is designed for a job with three tasks. The task times are 0.3 minutes, 1.4 minutes, and 0.7 minutes. The minimum cycle time in minutes is:
2.4
0.7
1.4
0.3