Question: A production process has a process capability ratio, C p = 1.32; at a certain time it was discovered that the process mean has shifted
A production process has a process capability ratio, Cp = 1.32; at a certain time it was discovered that the process mean has shifted to the right of the desired mean, and the process capability index, Cpk = 0.82. Answer the following questions. (1) The process has a sigma-rating = -sigmas (just enter the number value, rounded to TWO places of decimal) (2) Currently, in the shifted state the z-score of LTL is and the z-score of UTL is (Round all answers to TWO places of decimal)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
