Question: A production process has a process capability ratio, C p = 0.9700000000000002; at a certain time it was discovered that the process mean has shifted

A production process has a process capability ratio, Cp = 0.9700000000000002; at a certain time it was discovered that the process mean has shifted to the right of the desired mean, and the process capability index, Cpk = 0.87. Answer the following questions.

(1) The process has a sigma-rating =

(2) Currently, in the shifted state the z-score of LTL is and the z-score of UTL is