Question: A project has the precedence requirements and activity durations shown in the table Draw the AOA network and using PERT technique, calculate early and late

A project has the precedence requirements and
A project has the precedence requirements and activity durations shown in the table Draw the AOA network and using PERT technique, calculate early and late event tings, and find the probability that the project will be completed within 22 days. Activity Predeccessor Optimistic dur. Most likely dur. Pessimistic dur. (days) (days) (days) 1 4 10 4 16 B 7 5 9 6 9 12 D A, B, C B, C 3 3 3 E 9 5 1 E F