Question: A project manager is determining the activity durations for completing an interior office building. The activities include installing 9 5 0 lineal feet of 3
A project manager is determining the activity durations for completing an interior office building. The activities include installing lineal feet of high metal stud walls, installing gypsum board on both sides, and finishing the gypsum board to a level finish. Using the PERT formula, determine the expected duration of each activity.
Optimistic time to install metal stud walls days
Most likely time to install metal stud walls days
Pessimistic time to install metal stud walls days
PERT Formula:
Optimistic time to install gypsum board days
Most likely time to install gypsum board days
Pessimistic time to install gypsum board days
PERT Formula:
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock