Question: A project may be accepted when its internal rate of return ( IRR ) is: greater than a minimum required rate of return less than
A project may be accepted when its internal rate of return IRR is:
greater than a minimum required rate of return
less than a maximum reguired rate of return
equal to the required rate of return
both A and