Question: A project may be considered a failure although it reaches all four objectives (P,T,S,C) => True or False ??? Four types of failure suggested by
- A project may be considered a failure although it reaches all four objectives (P,T,S,C)
=> True or False ???
- Four types of failure suggested by Fortune Petter in the system approach including
- objectives not met
- undesirable side effects
- designed failures
- inappropriate objectives are similar to S P T C failures (Scope, performance, time, cost)
=> True or False ???
3. A project manager should pay attention to mission and vision of the parent organization before to those of her project
=> True or False ???
4. Coeccurent engineering is a method to share the vision and mission of a project
=> True or False ???
- The similarity between "system thinking" and "linear thinking" is their "feedback" characteristics
=> True or False ???
6. In order to understand a system, one needs to define 3 factors:
1) the elements of the system
2) the interaction between these elements
3) the time gap for responses
=> True or False ???
7. In system thinking we hardly find equal or symmetrical agreement for every situation in order to avoid conflicts
=> True or False ???
8. In Systems thinking problems should be solved by the same level of thinking that has created them
=> True or False ???
9. Being used to linear thinking one rarely views and solves a problem on a system model
- True or False ???

Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts