Question: A project may be considered a failure although it reaches all four objectives (P,T,S,C) => True or False ??? Four types of failure suggested by

  1. A project may be considered a failure although it reaches all four objectives (P,T,S,C)

=> True or False ???

  1. Four types of failure suggested by Fortune Petter in the system approach including
  1. objectives not met
  2. undesirable side effects
  3. designed failures
  4. inappropriate objectives are similar to S P T C failures (Scope, performance, time, cost)

=> True or False ???

3. A project manager should pay attention to mission and vision of the parent organization before to those of her project

=> True or False ???

4. Coeccurent engineering is a method to share the vision and mission of a project

=> True or False ???

  1. The similarity between "system thinking" and "linear thinking" is their "feedback" characteristics

=> True or False ???

6. In order to understand a system, one needs to define 3 factors:

1) the elements of the system

2) the interaction between these elements

3) the time gap for responses

=> True or False ???

7. In system thinking we hardly find equal or symmetrical agreement for every situation in order to avoid conflicts

=> True or False ???

8. In Systems thinking problems should be solved by the same level of thinking that has created them

=> True or False ???

9. Being used to linear thinking one rarely views and solves a problem on a system model

  • True or False ???

A project may be considered a failure although it

1. A project may be considered a failure although it reaches all four objectives (LI,S.C) => True or False ??? 2. Four types of failure suggested by Fortune Petter in the system approach including 1) objectives not met 2) undesirable side effects 3) designed failures 4) inappropriate objectives are similar to SPTC failures (Scope, performance, time, cost) True or False ??? 3. A project manager should pay attention to mission and vision of the parent organization before to those of her project => True or False ??? 4. Seeccurent engineering is a method to share the vision and mission of a project => True or False ??? 5. The similarity between "system thinking" and "linear thinking" is their "feedback" characteristics => True or False ??? 6. In order to understand a system, one needs to define 3 factors: 1) the elements of the system 2) the interaction between these elements 3) the time gap for responses => True or False ??? 7. In system thinking we hardly find equal or symmetrical agreement for every situation in order to avoid conflicts => True or False ??? 8. In Systems thinking problems should be solved by the same level of thinking that has created them => True or False ??? Being used to linear thinking one rarely views and solves a problem on a system model > True or False ??? 9

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!