Question: A project network is shown below. All activity times are given in days. Suppose C could be shortened by three days (i.e., C takes 3
A project network is shown below. All activity times are given in days. Suppose C could be shortened by three days (i.e., C takes 3 days to complete instead of 6) and F could be shortened by one day (i.e., F takes 7 days instead of 8). With these changes in activity times of C and F, how long will it take to complete the project?
Question 1 options:
|
| none of the choices are correct |
|
| 21 |
|
| 23 |
|
| 25 |
|
| 24 |
Question 2
Machine X is being used to produce a product. Machine X is not correctly calibrated which is causing a wide variation in product quality. This type of variation is called ______________.
Question 2 options:
|
| product variation |
|
| technological variation |
|
| common variation |
|
| assignable variation |
Question 3
If the best operating level of a process X is 1026 bottles per day and the actual output during a day is 786 bottles, then what is the capacity utilization rate for process X? [Select the appropriate range in which your answer falls.]
Question 3 options:
|
| less than or equal to 30% |
|
| greater than 30% but less than or equal to 50% |
|
| greater than 50% but less than or equal to 70% |
|
| greater than 70% but less than or equal to 90% |
|
| greater than 90% |
Question 4
A service facility has five workcenters. Each workcenter is of same size and shape (length = width = 20 feet). The size of the whole facility is 100 feet X 20 feet (length = 100 feet and width = 20). How many unique layouts are possible? [Select the appropriate range in which your answer falls.]
Question 4 options:
|
| More than 0 but less than or equal to 10 |
|
| More than 10 but less than or equal to 50 |
|
| More than 50 but less than or equal to 100 |
|
| More than 100 but less than or equal to 150 |
|
| More than 150 |
Question 5
Typically, a hospital will most likely have which one of the following layouts?
Question 5 options:
|
| assembly line |
|
| workcenter |
|
| project layout |
|
| manufacturing cell |
Capacity utilization rate for machine A is higher than the capacity utilization rate for machine B. If the capacity used by both the machines is the same, which one of the following statements is correct?
Question 7 options:
| best operating level of machine A is equal to the best operating level of machine B | |
| best operating level of machine B is higher than the best operating level of machine A | |
| best operating level of machine A is higher than the best operating level of machine B | |
| none of the choices are correct |
Question 8
A manufacturer has decided to locate a new factory in the northwest U.S. to serve growing demand in that market and has narrowed the potential sites down to two finalists, City X and City Y. The manufacturer developed a list of important factors to consider in selecting the site. Next, each city was rated against each factor as shown in the following table. According to the Factor-Rating method, which city should the manufacturer select?
| Factors | City X | City Y |
| Utility rates | 100 | 110 |
| Availability of skilled labor | 78 | 75 |
| Tax rates | 40 | 30 |
| Transportation | 46 | 38 |
| Proximity to suppliers | 35 | 29 |
| Quality of life | 19 | 16 |
Question 8 options:
| City Y | |
| City X |