Question: A project network is shown below. All activity times are given in days. Suppose C could be shortened by three days (i.e., C takes 3

A project network is shown below. All activity times are given in days. Suppose C could be shortened by three days (i.e., C takes 3 days to complete instead of 6) and F could be shortened by one day (i.e., F takes 7 days instead of 8). With these changes in activity times of C and F, how long will it take to complete the project?

Question 1 options:

none of the choices are correct

21

23

25

24

Question 2

Machine X is being used to produce a product. Machine X is not correctly calibrated which is causing a wide variation in product quality. This type of variation is called ______________.

Question 2 options:

product variation

technological variation

common variation

assignable variation

Question 3

If the best operating level of a process X is 1026 bottles per day and the actual output during a day is 786 bottles, then what is the capacity utilization rate for process X? [Select the appropriate range in which your answer falls.]

Question 3 options:

less than or equal to 30%

greater than 30% but less than or equal to 50%

greater than 50% but less than or equal to 70%

greater than 70% but less than or equal to 90%

greater than 90%

Question 4

A service facility has five workcenters. Each workcenter is of same size and shape (length = width = 20 feet). The size of the whole facility is 100 feet X 20 feet (length = 100 feet and width = 20). How many unique layouts are possible? [Select the appropriate range in which your answer falls.]

Question 4 options:

More than 0 but less than or equal to 10

More than 10 but less than or equal to 50

More than 50 but less than or equal to 100

More than 100 but less than or equal to 150

More than 150

Question 5

Typically, a hospital will most likely have which one of the following layouts?

Question 5 options:

assembly line

workcenter

project layout

manufacturing cell

Capacity utilization rate for machine A is higher than the capacity utilization rate for machine B. If the capacity used by both the machines is the same, which one of the following statements is correct?

Question 7 options:

best operating level of machine A is equal to the best operating level of machine B

best operating level of machine B is higher than the best operating level of machine A

best operating level of machine A is higher than the best operating level of machine B

none of the choices are correct

Question 8

A manufacturer has decided to locate a new factory in the northwest U.S. to serve growing demand in that market and has narrowed the potential sites down to two finalists, City X and City Y. The manufacturer developed a list of important factors to consider in selecting the site. Next, each city was rated against each factor as shown in the following table. According to the Factor-Rating method, which city should the manufacturer select?

Factors City X City Y
Utility rates 100 110
Availability of skilled labor 78 75
Tax rates 40 30
Transportation 46 38
Proximity to suppliers 35 29
Quality of life 19 16

Question 8 options:

City Y

City X

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!