Question: A project network is shown below. All activity times are given in days. Suppose C could be shortened by three days (i.e., C takes 3

A project network is shown below. All activity
A project network is shown below. All activity times are given in days. Suppose C could be shortened by three days (i.e., C takes 3 days to complete instead of 6) and F could be shortened by one day (i.e., F takes 7 days instead of 8). With these changes in activity times of C and F how long will it take to complete the project? BS) (C(61) AC G(3) (D( (4) F(8) none of the choices are correct 23 24 21 25 10 SK Question 7 (4 points) If the best operating level of a process X is 1026 bottles per day and the actual output during a day is 786 bottles, then what is the capacity utilization rate for process X? [Select the appropriate range in which your answer falls.] less than or equal to 30% greater than 30% but less than or equal to 50% greater than 50% but less than or equal to 70% greater than 70% but less than or equal to 90% greater than 90% 35

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!