Question: A Quality Analyst wants to construct a control chart for determining whether errors in bank transactions are under control. She looked at samples of 1000
A Quality Analyst wants to construct a control chart for determining whether errors in bank transactions are under control. She looked at samples of 1000 transactions each week, for four weeks in a row. A transaction was considered defective, if the analyst detected any error in the transaction.
Week Total Defectives
1 50
2 27
3 15
4 35
What are the upper and lower control limits for this control chart, using 3 sigma control limits?
None of the other options are correct .0428 and .0206
.0487 and .0153
.3495 and .2905
.0364 and .2757
Step by Step Solution