Question: A quality control manager was having problems with the manufacturing process. Over 25% of the parts were being scrapped as they had various (A-E) problems.

A quality control manager was having problems
A quality control manager was having problems with the manufacturing process. Over 25% of the parts were being scrapped as they had various (A-E) problems. They have kept track for a month and determined the following numbers for each of the problems denoted by letters. Cause A B D E Total Number Scrapped 15 32 50 41 20 158 With the data above, complete the chart below to allow the completion of a Pareto chart. Take all % calculations to two decimals. (6 marks)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock