Question: A recently installed assembly line has problems with intermittent breakdowns. Recently, it seems that the equipment fails at some point during 1 5 % of

A recently installed assembly line has problems with intermittent breakdowns. Recently, it seems that the equipment fails at some point during 15% of the eight-hour shift that the plant operates. Each day contains three consecutive shifts. What is the probability that the assembly line breaks down during only one shift during a chosen day?
Question 9Select one:
a.
0.3859
b.
0.3825
c.
0.6141
d.
0.6749
e.
0.3251