Question: a ) Reinforced Concrete Elevated Platform Reinforced Concrete Elevated Platform Drawing No . FR / S - 0 1 Rev B ( not to scale
a Reinforced Concrete Elevated Platform
Reinforced Concrete Elevated Platform
Drawing No FRS Rev B
not to scale
Drawing No FRS Rev A
not to scaleWith reference to Drawing Nos. FRS and FRS prepare a takeoff list, and then take off the quantities of both substructure and superstructure for the reinforced concrete elevated platform, including all relevant work sections.
Note :
As no steel reinforcement details are provided by the Project Structural Engineer, allow a Provisional Sum of HK$ in the take off.
b the project team has decided that the design, supply and installation of metal cladding to the vertical faade of the reinforced structure will be carried out by a Nominated Subcontractor instead by the Main Contractor.
The cost estimate of Nominated Subcontract Sum for the above works is million inclusive markup of profit and attendance by the Main Contractor.
Please draft the above Prime Cost Sum and the associated items in BQ format for tender in the answer book
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock