Question: a ) Reinforced Concrete Elevated Platform Reinforced Concrete Elevated Platform Drawing No . FR / S - 0 1 Rev B ( not to scale

a) Reinforced Concrete Elevated Platform
Reinforced Concrete Elevated Platform
Drawing No. FR/S-01 Rev B
(not to scale)
Drawing No. FR/S-02 Rev A
(not to scale)With reference to Drawing Nos. FR/S-01 and FR/S-02, prepare a take-off list, and then take off the quantities of both substructure and superstructure for the reinforced concrete elevated platform, including all relevant work sections.
Note : -
As no steel reinforcement details are provided by the Project Structural Engineer, allow a Provisional Sum of HK$200,000 in the take off.
b) the project team has decided that the design, supply and installation of metal cladding to the vertical faade of the reinforced structure will be carried out by a Nominated Sub-contractor instead by the Main Contractor.
The cost estimate of Nominated Sub-contract Sum for the above works is 2.2 million inclusive 10% mark-up of profit and attendance by the Main Contractor.
Please draft the above Prime Cost Sum and the associated items in BQ format for tender in the answer book
a ) Reinforced Concrete Elevated Platform

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!