Question: A road construction work. cliff material must be removed. The type of material is broken granite. The material is then compacted into a road
A road construction work. cliff material must be removed. The type of material is broken granite. The material is then compacted into a road body 10 KM long, 10 M wide, 30 cm high. 3 km 10m The heavy equipment used involves, excavators, trucks and compactors. the work must be completed within 60 working days. Design the number of heavy equipment required. Workmanship reference: https://drive.google.com/drive/folders/16r3RB2YQhgAzjFX- A4R40KKUSMCddH6z Please work by finding the time and how much heavy equipment is needed in 60 days, all based on appropriate assumptions, the material is on the drive if there is a source of heavy equipment reference from outside please note it.