Question: A running program produces data at a rate (in Kbytes/second) determined by the function: Where, t is the burst period. The data is consumed by
A running program produces data at a rate (in Kbytes/second) determined by the function:
Where, t is the burst period. The data is consumed by another running program at a rate determind by the function:
If the burst period, T, is known to be 5.0 seconds, what is the minimum necessary buffer size?
2.5t 2 when 0.0 s t s 0.8) when 0.8
Step by Step Solution
3.43 Rating (159 Votes )
There are 3 Steps involved in it
To find the minimum necessary buffer size we need to calculate the difference in the amount of data ... View full answer