Question: A sample project has been created for this assignment. The details are found in this document: Sample Project (Word Document) Read the document and complete

 A sample project has been created for this assignment. The detailsare found in this document: Sample Project (Word Document) Read the documentand complete the calculations as instructed using this template: Calculating Resource EstimatesTemplate {Word Document} Once complete, answer the following questions. You will have

A sample project has been created for this assignment. The details are found in this document: Sample Project (Word Document) Read the document and complete the calculations as instructed using this template: Calculating Resource Estimates Template {Word Document} Once complete, answer the following questions. You will have one attempt to submit your answers for this assignment. Your score will be reected in your overall grade. Lesson 8 Assignment Sample Project Project: School classroom computer integration The school district is moving away from the computer lab concept and moving computers into the classrooms to allow teachers to fully integrate the use of computers with their lessons. You are in charge of the computer integration in the local middle school. There is currently one large computer lab. This is will be emptied {in project scope} and eventually repurposed [out of project scope}. Each student will be issued a tablet for use during the school year. There are 30 classrooms in this school. You must establish enough wireless access points {WAPJ to support the student population of approximately 666 students. The classrooms must have additional electrical outlets located throughout the room and not just around the periphery. The decision has been made to install small dimension columns and route electrical and network {for printers] wiring from the ceiling crawl space into the individual classrooms. A dedicated teacher station will be created and include overhead projection capability for demonstration purposes. The project will include purchasing the entire networking equipment and installation. A network closet has been identified and will need to be outfitted with required hardware. The network will require login permissions. The school staff will have the ability to whitelist approved website and block website with inappropriate content. The entire project must be complete over the summer break {16' weeks]. The number of days for each activity is based on the schedule requirements. Instructions: Estimate the number of resources needed for each of the following skill sets and estimated hours. The number of days is project days. It is not calendar days {includes work and nonwork days). Each work day is assumed to be 8 hours. Always round up to the next 1.ru'hole day. Use the spreadsheet template to complete your work. Cells highlighted are to be calculated and filled in. 1. Create a WAP map for the school to determine the number of WAPs needed. Resource: WAP technician [1] estimated 5 hours. 2. Identify network equipment for purchase. Resource: WAP technician [1] estimated 3 hours Procure network equipment. Resource: procurement specialists [2] 30 hours 4. Build out network closet. Construction personnel {1} estimated 16 hours; then a painter {1] estimated 8 hours, then IT technician {2] estimated 24 hours 5. Run cable in ceiling space from each WAP back to the network closet. Resource: cable installers to complete work within 6 project days. Estimated: 206 hours 6. Run cable for 2 network printers in each classroom back to network closet. Resource: network technician. Estimated 36 hours and must be completed within 16 days I". Add 16 additional outlets in each classroom. Resource: electricians. Electrical work must be completed within 16 days. Estimated 156 hours 8. Install and test WAP hardware. WAP technicians. Estimated 160 hours and must be completed within 16 days l-u El. Install teacher station computer and monitor in each classroom. Resource: IT technicians. Estimated 120 hours and must be completed within 15 days 10. Installation of projection screen in each classroom. Resources: construction personnel to install ceiling mount and screen. Estimated 24!} hours and must be completed within 1C! days. Calculate the number of construction personnel needed. Electricians to install screen control buttons. Estimated 60 hours and you have a team of ve electricians to get the work done. 11. Install and test overhead projectors in each classroom. Resources: IT technicians. Estimated 4 hours per classroom. Calculate the total number of estimated hours. Calculate the number of resources to get the work done in 5 days. 12. Set up and test network including permissions. Resources: system administrator {1]. Estimated 151] hours. Calculate the number of days. Lesson 8 Assignment Template Activity ID# Description Resource types Estimated hours # of Resources # of Days 1 Create WAP map WAP technician 5 1 2 Identify network equipment WAP technician 8 1 3 Procure network equipment Procurement specialist 30 2 4 Build out network closet Construction personnel 16 1 4 Build out network closet Painter 8 1 Build out network closet IT technicians 24 2 5 Run cable Cable installers 200 5.0 6 Run cable for printers Network technician 80 16 7 Add electrical outlets Electrician 150 10 8 Install / test WAP hardware WAP technician 100 10 9 Install teacher station IT technicians 120 15 10 Install projection screen Construction personnel 240 10 10 Install projection screen Electrician 60 5 11 Install/test overhead projectors IT technicians 5 12 Set up / test network System administrator 150

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!