Question: A schedule that pulls material into final assembly at a constant rate is a Level schedule Uniform schedule Master production schedule Kanban pull system Lean
A schedule that pulls material into final assembly at a constant rate is a
Level schedule
Uniform schedule
Master production schedule
Kanban pull system
Lean schedule