Question: A schedule that pulls material into final assembly at a constant rate is called _ _ _ _ _ _ _ _ _ _ .
A schedule that pulls material into final assembly at a constant rate is called blank
Multiple Choice
a lean schedule
the kanban pull system
a master production schedule
a level schedule
a uniform schedule