Question: A Scraper utilized on a project has a heaped capacity of 3 1 LCY . The material will swell 2 4 % , shrink 8

A Scraper utilized on a project has a heaped capacity of 31 LCY. The material will swell 24%, shrink 8% and has in in-situ weight of 100lbs? cuff. How many BCY will fill the Scraper (round your answer to the nearest tenth of a cubc yard)?