Question: A separator is opened in an industry during shutdown in order to carry out patch plate welding and also to change the demister pad (mesh

A separator is opened in an industry during shutdown in order to carry out patch plate welding and also to change the demister pad (mesh pad). The job is carried out by two mechanical technicians. They complete the job and ask for a closure of work order. Identify the aspects need to be checked in the vessel before the work order can be closed? Refer the diagram given below: Separator" by AFP tech srl is in the Public Domain