Question: A shallow trench for a 2 , 0 0 0 ft waterline installation project. It will take five days to install the first 1 ,
A shallow trench for a ft waterline installation project. It will take five days to install
the first of pipe. A water meter will then be installed during the following four
days at the end of the pipe. After the meter is installed, the remaining feet of pipe
will be installed in ten days. Develop a linear schedule for this project.