Question: A shop floor performs 3 different operations on a part. Operation 1 , 2 and 3 takes 4 , 7 and 5 minutes respectively to
A shop floor performs different operations on a part.
Operation and takes and minutes respectively to
complete. The raw material is arriving with exponential
distribution of minutes. There is manual handling
operator travel speed of parts up to dompletion of all
the operations. After which, a forklift speed
carries bunch of parts to the shipping point. Find,
Throughput of shop floor. Run time: Reffer MMRun
Time sheet
Find Utilization of resources.
Suggestions for optimizing the shop floor
Material flow diagram:
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock