A single machine in a production process produces both small beach balls and large beach balls; it switches between each type of ball with no delay or setup time. The machine can complete a large beach ball in 30 seconds. A small beach ball takes only 20 seconds. Current demand for beach balls is 672 large beach balls per day and 1,008 small beach balls per day. Assume the facility operates a single 8-hour shift per day. Calculate the load factor of the facility (as a decimal, not percentage).